Music & Sound Design for...


Permalink
28th Aug 09

 

Almost there…

 

Our two 10 ot of 12’s (We’re called for 12 hours and work for 10 of them with a 2 hour dinner break) are done and we’ve been through the entire show now at least one time with sets, costumes, projection, lights, sound, acting, and music…

One thing that it’s always fun to see in tech is the costume design. After all the work you see the actors and director do in rehearsal, a good costume design (like the one we have in this show) is like a beautiful frosting job on a tasty cake! It helps really bring the show to life…

While I’m at the theater I’m finding it hard to post status updates, but I did write a little something while I waited for some rehearsing to happen yesterday.

———————-

Here’s my 20:

I have two networked computers in front of me. The one on the left is the show control computer and the one on the right is my laptop, loaded with LOGICĀ  and hooked up to a piano keyboard.

I write the cues on my laptop in Lgoic and then bounce them into Peak where I cut the fat, normalize, and resave them.

I then save the Peak file to a folder with the today’s date on it, which is echoed on the show control computer.

I then drag the finished file onto the show control computer and then drop them into Qlab and set levels in the house.

As far as the house is concerned I’m dealing with 12 channels. They are as follows

1. House LEft
2. House RIght
3. House Center
4. Subs
5. Left Surround
6. Right Surround
7. Upstage Right
8. Upstage Left
9. Stage Left (Behind Screen)
10. Center Sage (Behind Screen)
11. Stage Right (Behind Screen)
12. Our Firepit (Localized Speaker)
———————————

Today we aren’t called until 1:30 so I’m going to explore San Jose a little more. Tonight at 7:30 is our final dress rehearsal, so I really have today and tomorrow to make easy changes to the show before we get it in front of an audience.

So that’s the haps. I’m going to try and post the updated dance sequence here in a minute to give ya’ll some idea of what I’ve been doing the past few days…

 


Permalink
The Qlab interface…

The Qlab interface…

 


Permalink

Tech - Day Two update. Working with songs, and finishing the wrestling match…

 


Permalink
Sound and projection tech tables. Our audio engineer Steve is setting up my workstation.

Sound and projection tech tables. Our audio engineer Steve is setting up my workstation.

 


Permalink

A message before tech starts up…

 


Permalink
My hotel room production studio… :)

My hotel room production studio… :)

 


Permalink

Day 1 jetlagged report from San Jose.

 


Permalink
23rd Aug 09

 

Rehearsal note:

 

Pg 9: Rick wants an iPhone camera shutter click. I wonder how I can liberate that caf file from my iPhone.

Our cast is brilliant! I also forgot how sharp Rick is in rehearsal. He has laser focus and helps the actors craft their scenes in the best way possible…

There’s an actor here named Steve Irish who is truly hilarious as Touchstone!

 


Permalink
23rd Aug 09

 

Getting situated

 

Waking up and getting my bearings here in San Jose. I brought my Radium 61 to set up in my room. Along with my laptop and a pair of headphones I have an in room studio!

San Jose seems like a fun place to be the next few weeks! I’m bordering a big park ringed by restaurants and shops. Sharon, SJRep’s Company Manager, took me on a little tour of downtown last night after I got in, and I’m jealous that Atlanta doesn’t have a city center anywhere near as nice as this one.

I’m sure I’ll be posting picutres and videos as my time here goes on, but right now, I need to find some food!

 


Permalink